MELLOUSSA Renault factory

Usine Renault MELLOUSSA

EMT performs in a consortium with GTR Company earthworks and drainage of the new Renault factory in Melloussa.

The major quantities are:

  • 6 million m³ of building debris
  • 5 million cubic meters of embankments
  • 30,000 m³ of concrete work

The turnaround time is one year.

 

  Video of the site: Melloussa Renault Factory

TMSA - Tanger Méditerranée Port: Roll on roll off Port

TMSA - Port Tanger Méditerranée Port Roulier

Earthworks, drainage, roads and drinking water supply of the roll on roll off Port are in progress on behalf of the Tangier Mediterranean Special Agency.

They consist of:

  • 300,000 m³ of building debris
  • 1 million cubic meters of embankments
  • 6,000 m³ of concrete structures
  • 10,000 m³ of lines

and must be made within 12 months.

 

  Video of the site: roll on roll off Port

MAZER Dam

Barrage MAZER

The MAZER dam, in the Province of Settat, is close to completion on behalf of the Directorate of Hydraulic development.

The main quantities produced are:

  • 500,000 m³ of building debris
  • 2 million cubic meters of embankments

 

  Video of the site: MAZER Dam

Hydrocarbon Port

Port TANGER

EMT works in the storage and distribution of oil from the new Tangiers Mediterranean Port

The turnaround time is 12 months.

The major quantities are:

  • Building debris: 20 000 m³
  • Concrete: 10 000 m³
  • Geomembrane: 65 000 m²
  • Frames: 1000 T

  Video of the site: Hydrocarbon Port

TMSA - Tanger Mediterranean: littoral platform slope

TMSA - Port Tanger Méditerranée : Talus plateforme littorale

EMT performs on behalf of the Tangier Mediterranean Special Agency, earthworks and support of the littoral platform slope of the new Port of Tangiers Med.

The works are to achieve in 14 months and represent:

  • 2.5 million cubic meters of building debris
  • 15,000 m³ anchoring
  • 20,000 m³ of reinforced concrete
  • 2,500 tons of rebar

  Video of the site: littoral platform slope

JORF LASFAR Port

Port JORF LASFAR

EMT performs reinforcement works of the main dike of the port of Jorf Lasfar.

The turnaround time is 24 months.

The major quantities are:

  • T 20 tetrapods: 750 units
  • Blocks 2.75 m³: 500 units
  • Riprap: 20 000 T

  Video of the site: JORF LASFAR Port

TAMALOUT Dam

Barrage TAMALOUT

EMT performs the construction works of Tamalout dam in the province of Khénifra.

The dam is of the BCR type with gravity spillway with free threshold on the downstream face of the dam.

The turnaround time is 36 months.

The major quantities are:

  • 400,000 m³ of building debris
  • 30,000 m³ of conventional concrete
  • 390,000 cubic meters of roller compacted concrete

  Video of the site: Tamalout Dam

TIMKA Dam

Barrage TIMKIT

EMT started the construction of Timka dam in the Province of Errachidia.

The dam is of the BCR type with gravity spillway with free threshold.

The turnaround time is 32 months.

The major quantities are:

  • 150,000 m³ of building debris
  • 70,000 m³ of conventional concrete
  • 100,000 cubic meters of roller compacted concrete

  Video of the site: Timka Dam

SIDI ABDELLAH dam

Barrage SIDI ABDELLAH

EMT has begun the construction of Sidi Abdellah dam in the province of Taroudant.

The dam is of the BCR type with gravity spillway and free threshold.

The turnaround time is 42 months.

The major quantities are:

  • 433,000 m³ of building debris
  • 50,843 m³ of conventional concrete
  • 585,000 cubic meters of roller compacted concrete

  Video of the site: Sidi Abdellah Dam